Based on your location, we think there is a website better suited to you.

Tate Global AMER
Case Studies

Aire Park - a vibrant regeneration project on Leeds' South Bank

Sector:
Commercial Office
Location:
South Bank, Leeds
Completion date:
June 2024
Architect:
Ryder Architecture

A remarkable 24-acre vision created on Leeds’ flourishing South Bank by a world-class team of designers, planners, manufacturers, and architects, featuring Tate RMG600 raised access floors.

Urban Redevelopment Project Leeds' Burgeoning South Bank

An iconic project, establishing a flourishing new commercial and residential neighbourhood.

Smart, contemporary working and commercial spaces, constructed to the highest standards, delivering sustainability and design excellence.

The 24-acre site is now owned by Vastint, an international real estate organisation specialising in large-scale urban developments that balance working, living and leisure. These inner-city spaces are thoughtfully designed to be characterful, as well as connected into their history and the local context.

Well-connected and Sustainable Development

The company’s vision for Aire Park is to establish a well-connected and sustainable mixed-use neighbourhood of homes, offices, retail, leisure and public outdoor spaces. The eight-acre park will provide a vital link between the city centre with the Tetley site and its creative neighbours, across to the education district and communities to the south.

Part of the development is 28,000 sq m (301,000 sq ft) of contemporary commercial office and flexible-use retail space at 1 & 3 South Brook Street. These new build premises were constructed to the highest standards of industry accreditation, earning (among other accolades) a BREEAM Excellent rating.

Under a full-service agreement, Tate’s in-house Contracts team were commissioned to supply and install 19,000 sq m (204,500 sq ft) of Tate RMG600 raised access floor into the building office space.

The RMG600 floor range has been independently tested and certified to the highest industry standards, certifying it as achieving PSA Medium Grade performance specification. It is competitively priced and comes with a 25-year guaranteed warranty.

Tate’s Contracts team completed the floor installation ahead of schedule, winning praise for their proactivity, professionalism, flexibility, and close collaboration with other on-site trades.

Tate Aire Park Leeds Case Study Full Width Image Block Desktop En Uk

Among the two buildings’ many accreditations are:

  • BREEAM Excellent
  • WELL Platinum
  • EPC Rating 'A'
  • WiredScore Gold

For the flooring in the office areas, Ryder specified Tate’s RMG600 PSA:2021 Medium Grade raised access floor panels. This high-performance floor, manufactured by a world-leading company, has been independently performance-tested by the PSA to the highest industry standards.

It is ideal for modern commercial spaces, providing a safe, effective and discrete environment for building services while each of the panels contains up to 75% recycled content without compromising on strength or aesthetics.

Plus, it comes with verified environmental credentials, a guaranteed 25-year warranty, and assured availability.

The installation was managed by Tate’s in-house Contracts Team.

Frequently Asked Questions

Aire Park is a 24-acre urban regeneration scheme which has created a connected, mixed-use neighbourhood of homes, offices, retail, leisure and major public green space.

Now owned by the an international real estate organisation, Vastint, Aire Park blends commercial and residential uses, while linking the city centre to surrounding districts.

Its design prioritises character and walkability, and integrates seamlessly with the area’s heritage, positioning it as one of the most ambitious mixed-use urban transformations in the North.

Aire Park’s commercial buildings and flexible-use retail space, located at 1 & 3 South Brook Street, offer exceptional sustainability credentials, including BREEAM Excellent, WELL Platinum, EPC A, and WiredScore Gold.

These accreditations reflect the developer’s holistic approach to environmental stewardship, while ensuring high standards of user wellbeing and operational efficiency across the wider regeneration scheme.

Tate’s in-house contracts team supplied and installed 19,000 sq metres of the company’s market-leading RMG600 raised access floor.

The PSA Medium Grade flooring system offers long-term durability and guaranteed performance under its 25-year warranty. Each of the panels contains up to 75% recycled content without compromising on strength or aesthetics.

The contracts team delivered the floor installation ahead of schedule, winning praise for their proactivity, professionalism, flexibility, and close collaboration with other on-site trades.