39 Results
Raised Access Flooring: 2025 Sustainability Update
Our 2025 Planet Passionate report shows great progress towards our global sustainability goals. As part of Kingspan Group’s Planet Passionate initiative, our flooring unit in Hull, UK, continues to drive meaningful change in how raised access flooring systems are made, used, and reused.
What are ISO Certifications and why do they matter?
Tate is proud to hold a suite of internationally recognised ISO accreditations that underpin our commitment to quality, safety, and environmental responsibility. These standards support the way we design, manufacture, install and maintain raised access flooring systems, and they provide real benefits to our customers. Read a practical overview of our key ISO accreditations and how they support our business and your projects.
What is Cradle to Cradle Certified® and Why Does it Matter?
Cradle to Cradle Certified® is a globally recognised, science-based certification programme for designing and manufacturing products that are safe, circular, and responsibly made. Read more about what this means in the industry and what it means for Tate Raised Access Flooring products.
Integrated Liquid Cooling: Rethinking the MEP's Role in the Data Hall
Direct liquid cooling is no longer a specialist solution for high‑density data halls. This piece looks at the coordination challenges it introduces and how integrated approaches can reduce risk, labour and programme uncertainty.
Sealing the Deal: Containment as the Key to Cooling AI
A look at why containment is becoming the foundational infrastructure for high density and hybrid cooled data centers, enabling operators to scale AI workloads with stability, efficiency, and reduced risk.
Integrated Deployment Must Become The Default
As AI drives unprecedented density and speed in data center development, traditional fragmented delivery models are struggling to keep pace. This article explores why modular systems, designed to interlock from day one, are becoming essential for scalable, predictable, and AI-ready infrastructure.
Tate Expands Offsite Manufacturing Capabilities to Accelerate Data Center Construction: iMasons Member Stories
iMasons explores how Tate is expanding its offsite manufacturing capabilities to support faster, more efficient data center construction.
PSA: 2021 vs BS EN 12825: 2001 - A Practical Guide to Raised Access Floor Performance Standards
Understand the key differences between PSA: 2021 and BS EN 12825: 2001 when specifying raised access flooring. This practical guide explains how each standard defines performance, testing, and load classifications, helping architects, consultants, and contractors make informed specification decisions for UK, Ireland, and international projects.
The modular imperative: Redesigning the white space for AI
A new standard of data center design is emerging as AI drives rack loads of 130kW and beyond. By defaulting to modular construction and pre-integrated systems, operators gain the speed, precision, and predictable delivery required to meet today’s deployment timelines.