Knowledge Articles

Explore our Expert Insights

Welcome to our knowledge hub, where you can access
a wide range of articles on data centre and commercial 
office innovation and product expertise.

Tate Knowledge Hub small banner en uk

52 Results

Filter By:
14/12/2026
Tate Uk Sustainable Buildings Article Listing 02

Sustainability in Raised Access Flooring: Embodied Carbon is Becoming Mainstream

Embodied carbon is becoming a mainstream priority in construction. Drawing on the NBS Sustainable Futures Report 2026, this article explores how lower-carbon raised access flooring and panel reuse can help project teams reduce their environmental impact.

Knowledge Articles
07/12/2026
Tate Uk Sustainable Buildings Article Listing 03

Sustainability in Raised Access Flooring: Trusted Sustainability Data

Trusted, accessible environmental data is essential for sustainable construction. Drawing on the NBS Sustainable Futures Report 2026, this article explores the evidence gap and how Tate supports informed product choices through independently verified data.

Knowledge Articles
30/11/2026
Tate Uk Sustainable Buildings Article Listing 04

Sustainability in Raised Access Flooring: From Awareness to Implementation

Sustainability is moving from ambition to action in construction. Drawing on the NBS Sustainable Futures Report 2026, this article explores how robust specification, trusted environmental data and manufacturers like Tate can help turn sustainability goals into practical outcomes.

06/11/2026
Banner-Desktop - Tate Europe Konnect Logo

Konnect by Tate: Building Data-Centre Infrastructure for What Comes Next

Konnect by Tate: Building Data-Centre Infrastructure for What Comes Next

06/11/2026
Tate DCW Tate Whitepaper En Us

Carrying the Weight of AI

Carrying the Weight of AI

02/11/2026
Tate Engineers Planning Carousel Desktop Us En

How LCAs and EPDs Inform Data-Centre Specification

How LCAs and EPDs Inform Data-Centre Specification

30/10/2026
Tate Konnect Campaign Carousel Desktop

Speed-to-Power Starts Before Site Arrival

How Factory Preassembly and Integration are Accelerating Data Center Deployment

28/10/2026
Tate Konnect Header Image Desktop

AI’s Compute Density Challenge

AI’s Compute Density Challenge

19/10/2026
Tate Europe Provan Factory Desktop

Can Modular Construction Solve the Data Centre Delivery Challenge?

Can Modular Construction Solve the Data Centre Delivery Challenge?

1 2 3 4 5 6