As AI workloads drive higher rack densities and greater heat loads, cooling is becoming an increasingly important part of data center infrastructure planning.
That means the infrastructure surrounding cooling systems is even more critical. Structural support, access, routing, containment, airflow separation, manifold coordination, cable management and installation sequencing all play key roles, said Sinéad Lalor, Tate Director of Engineering.
Customers are looking for partners that can reduce complexity across systems, not just provide individual components, Lalor said.
Tate supports the physical layer required for high-density AI environments, with capabilities across structural systems, containment, airflow management, manifolds, manufacturing and installation that can help customers coordinate increasingly complex builds.
“Tate acts as an integrated physical infrastructure partner that helps make the deployment of power-dense, cooling-intensive infrastructure faster and easier to coordinate,” Lalor said.
In a fast-changing AI market, designing for adaptability can create more opportunities to reconfigure, expand or upgrade existing infrastructure as requirements change, extending its useful life where possible and reducing unnecessary replacement.
One way to build greater adaptability into physical infrastructure is through modular design, which can provide more flexibility to reconfigure or expand systems.
Depending on the application, that could mean adding capacity incrementally or reconfiguring infrastructure around changing density or cooling requirements.
Tate is exploring these principles in its infrastructure solutions, Lalor said. One example is PowerStack, Tate’s modular infrastructure platform designed for incremental scalability. Its design allows capacity to be added as demand grows, while providing greater flexibility to respond as requirements change.
“There is a practical sustainability benefit to adaptability,” Glinka said. “When infrastructure can be reconfigured, expanded or upgraded as requirements change, there is greater potential to keep existing systems and materials in service longer. That can reduce unnecessary replacement, along with the materials and embodied carbon associated with it.”
Although speed-to-market is a top priority, it doesn’t have to come at the expense of sustainability, Lalor said.
“Faster timelines can increase project risk if design, manufacturing, integration and installation are not coordinated early,” Lalor added. “Factory-controlled manufacturing, preintegration and clear installation planning can reduce field labor, rework, delays and site disruption.”
Tate’s integrated delivery model means that solutions are preassembled and tested at its manufacturing facility and delivered to the site, combining early coordination, manufacturing discipline and installation readiness to help customers reduce complexity and deliver more predictable outcomes. Bringing suppliers into the conversation early enables them to identify practical trade-offs and avoid late-stage changes.
The bottom line is that responsible AI infrastructure will be built by design, not by default. As the industry scales, the choices made around where and how infrastructure is designed, manufactured, deployed and adapted over time will shape both its performance and its sustainability, Glinka said.
Tate’s approach brings together lower-carbon materials, life cycle thinking, regional manufacturing and operational discipline to integrate sustainability more directly into infrastructure decisions.
“Meeting the scale and speed of AI demand will require us to make thoughtful infrastructure decisions from the outset,” Glinka said. “Sustainability is part of that equation, alongside performance, reliability and the ability to adapt as requirements change.”
This article was produced in collaboration between Tate and Studio B, written by Julia Troy.